Customization: | Available |
---|---|
Rolling Body: | Roller Bearings |
The Number of Rows: | OEM |
Still deciding? Get samples of US$ 999/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Steps of Order Injection parts
1. Negotiations: Quality, material, price, payment, delivery time item and so on.
2. Place an order: According to the customer's drawing or sample.
3.R&D: We could design or improve 3D modeling according to customer's requirements.
4. Mould Processing: CNC EDM machine processing then assembly and trial.
5. Sample confirm: we will send the trial sample to customers. Before shipment, if the sample isn't satisfied by customers. we will modify the mold until they are satisfied.
6. Mass Production: if customers need mass production of plastic products, we can offer them.
Material | PA,PA6,PA66,PP,PE,LDPE,HDPE,UWHDPE,PTFE,POM,ABS,or Custom Compound (Any custom compound plastic is available) |
Size | According to samples or drawings |
Color | Black,white,red,green,transparent or any color according to Pantone colors |
Finish | High Gloss,Fine Grain,Electroplating,Painting,Printing,Texture etc,or as request |
Type | Round,square,rectangular,or any nonstandard shape as request |
Logo | Debossed,embossed,printed logo or as request |
Our Certification
Zhongde is an SGS-verified manufacturer. We have passed ISO9001:2005 quality control certification as well as environment management certification.
Packing Details:
Wooden case packing, Paper case packing, Plastic case packing, Bubble wrap packing
Normally the goods are packaged as the picture shows, or they can be customized.
Delivery Details:
15-25 days for mold making, and parts delivery time depends on the quantity of production. We will discuss with our customers to choose the suitable shipping method for goods.