Rolling Body: | Roller Bearings |
---|---|
The Number of Rows: | Multi-column |
Outer Dimension: | Small and Medium-Sized (60-115mm) |
Samples: |
For sample price, package information, and logisti
|
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Bushing Material | NR,CR,NBR,SBR, SILICONE,VITON,EPDM, HNBR, BUNA, etc. |
Rubber Compound | Can be UL, FDA, ROSH or REACH approved, and free test slabs and hardness testers can be offered for customer's testing |
Application | Car shock absorber, Motorcycle shock absorber, Bicycle shock absorber |
Production Equipment | Rubber compression/injection machines including 150T,200T,250T, 300T and 500T |
Manufacturability | 1. Auto Mechanical Press: 50T, 100T, 140T 2. Hydraulic Press: 100T, 315T, 600T, 800T 3. Six sinter furnaces, including one harden Sinter Furnace 4. Heat treatment: Carbonitriding quenching and high frequency quenching 5. Ultrasonic clearing and auto deburring 6. In-house tooling making: EDM, wire cutting machine 7. Strength in machining: Machine center, CNC milling, CNC lathe, Two end lapper etc. |
Current export market | Taiwan, America, South America ,Europe,, Africa, Middle East, etc |
QMS | ISO9001:2008, ISO/TS16949:2009, ISO14000:2004, OHSAS18001:1999 |
Advantage | 1. Well experience service 4. Familiar with automobile industry requirement. OEM manufacturer 2. 15 years in the shock absorber parts industry 3. Professional technology service 4. Familiar with automobile industry requirement. |
Rubber products | 3-7 days after the payment |
Plastic products | 5-7 days after the payment |
CNC machined parts | 3-10 days after the payment |
Standard products | 1-3 days after the payment |
Rubber & Plastic products workshop | The professional production workshops for plastic and rubber products will make sure the quality and lead time. |
Mold making workshop | We have our own workshop to make sure mold precision and lead time. |
CNC machining workshop | We introduced DMG CNC machining Center from Germany to meet customer's requirements for precision and production capacity. |
QC & Packaging | To save lead time, the production ,inspection and packaging is doing at the same time. |
Shipment | We have signed a long-term cooperation contract with international shipping agent and express company, so that the shipping safety and arriving time are secured |
Suppliers with verified business licenses